Sizes
Sizes |
22 |
24 |
26 |
28 |
30 |
Year | 2012 | 2012 | 2011 | 2011 | 2012 |
Pilot weight |
51-63 kg
|
57-72 kg
|
66-86 kg
|
75-95 kg
|
84-109 kg
|
Flight weight |
68-80 kg
|
75-90 kg
|
85-105 kg
|
95-115 kg
|
105-130 kg
|
Price | 3680 € | 3680 € | 3680 € | 3680 € | 3680 € |
Wing weight | 4.70 kg | 5.00 kg | 5.40 kg | 5.80 kg | 6.20 kg |
|
Area | 22.06 m2 | 24.10 m2 | 25.94 m2 | 27.86 m2 | 30.42 m2 |
Span | 11.50 m | 12.02 m | 12.46 m | 12.92 m | 13.50 m |
Ratio | 5.99 | 5.99 | 5.99 | 5.99 | 5.99 |
Flattening | 14 % | 14 % | 14 % | 14 % | 14 % |
Area (proj.) | 19.02 m2 | 20.77 m2 | 22.36 m2 | 24.01 m2 | 26.22 m2 |
Span (proj.) | 9.22 m | 9.63 m | 10.00 m | 10.36 m | 10.83 m |
Ratio (proj.) | 4.47 | 4.47 | 4.47 | 4.47 | 4.47 |
|
Speed Acc./Base/Min. |
57/39/24 km/h
|
57/39/24 km/h
|
57/39/24 km/h
|
57/39/24 km/h
|
57/39/24 km/h
|
Glide ratio avg. | 10.00 | 10.00 | 10.00 | 10.00 | 10.00 |
Best sink rate | 1.00 m/s | 1.00 m/s | 1.00 m/s | 1.00 m/s | 1.00 m/s |
Optimal speed | 39.00 km/h | 39.00 km/h | 39.00 km/h | 39.00 km/h | 39.00 km/h |
Optimal sink rate | 1.10 m/s | 1.10 m/s | 1.10 m/s | 1.10 m/s | 1.10 m/s |
|
Class/cert. | EN-C | EN-C | EN-C | EN-C | EN-C |
Main use | Cross | Cross | Cross | Cross | Cross |
Latest ads
Wing |
Class |
Flight weight |
Country |
Model |
Hours |
Price |
Gradient Aspen 4 (28)
|
EN-C |
95-115 kg |
IT |
2011 |
30 h |
€ 500
|
Gradient Aspen 4 (26)
|
EN-C |
85-105 kg |
HU |
2011 |
20 h |
€ 1600
|
Gradient Aspen 4 (26)
|
EN-C |
85-105 kg |
ES |
2011 |
85 h |
€ 950
|
Gradient Aspen 4 (28)
|
EN-C |
95-115 kg |
FR |
2011 |
38 h |
€ 1200
|
Gradient Aspen 4 (28)
|
EN-C |
95-115 kg |
CZ |
2011 |
180 h |
€ 750
|
Gradient Aspen 4 (26)
|
EN-C |
85-105 kg |
NO |
2011 |
135 h |
€ 600
|
Gradient Aspen 4 (28)
|
EN-C |
95-115 kg |
PT |
2011 |
140 h |
€ 650
|
Gradient Aspen 4 (28)
|
EN-C |
95-115 kg |
CA |
2011 |
300 h |
€ 262
|
Gradient Aspen 4 (26)
|
EN-C |
85-105 kg |
MD |
2011 |
60 h |
€ 900
|
Gradient Aspen 4 (22)
|
EN-C |
68-80 kg |
RO |
2011 |
100 h |
€ 850
|
Gradient Aspen 4 (24)
|
EN-C |
75-90 kg |
GB |
2011 |
250 h |
€ 638
|
Gradient Aspen 4 (28)
|
EN-C |
95-115 kg |
PT |
2011 |
130 h |
€ 650
|
Gradient Aspen 4 (28)
|
EN-C |
95-115 kg |
IT |
2011 |
80 h |
€ 750
|
Gradient Aspen 4 (28)
|
EN-C |
95-115 kg |
PT |
2011 |
130 h |
€ 650
|
Gradient Aspen 4 (28)
|
EN-C |
95-115 kg |
HU |
2011 |
30 h |
€ 950
|
Gradient Aspen 4 (26)
|
EN-C |
85-105 kg |
IT |
2011 |
100 h |
€ 850
|
Gradient Aspen 4 (22)
|
EN-C |
68-80 kg |
RO |
2011 |
100 h |
€ 1000
|
Gradient Aspen 4 (26)
|
EN-C |
85-105 kg |
HU |
2011 |
115 h |
€ 900
|
Gradient Aspen 4 (26)
|
EN-C |
85-105 kg |
CZ |
2011 |
70 h |
€ 1100
|
Gradient Aspen 4 (22)
|
EN-C |
68-80 kg |
RO |
2011 |
100 h |
€ 1000
|